計(jì)算出焊接的頭子完全跑出導(dǎo)輪需要多少的鋼線計(jì)算公式,焊接處離導(dǎo)輪更后一根線的長度除以導(dǎo)輪槽距再乘以鋼線繞導(dǎo)輪一圈的長度,并以0.2m/s的速度走線,當(dāng)跑線過了500m時(shí)開啟入線口大張力臂當(dāng)跑線到了離200M就要出導(dǎo)輪的時(shí)候減少出線口張力臂直到焊頭跑了收線輪上,并將工作臺原有的高度上。
The calculation formula of the number of steel wire required for the welding head to run out of the guide wheel is calculated. The length of the welding place is divided by the length of the last line of the guide wheel by the guide wheel and the length of the one circle around the guide wheel, and the line at the speed of 0.2m/s. When the running line passes through 500m, the large force arm of the entrance is opened, and when the running line goes to the 200M, the opening force arm of the outlet is reduced until the welding head runs. On the take-up wheel and the original height of the workbench.
剪去斷線處松散的鋼線,并留出長于導(dǎo)輪間距>10cm的兩個鋼線頭子。
Cut out the loose steel wire at the broken line, and set aside two steel wire heads which are longer than the guide wheel spacing >10cm.
焊接的鋼線必有一段較長的一段松線,這一步我們要做的是將這一段送的鋼線跑到導(dǎo)輪上去。先將工作臺上升2mm開啟砂漿用手指撥起松弛的鋼線,并減少入線口的張力臂開啟導(dǎo)輪以0.1m/s的速度走線直到松線較緊的部在導(dǎo)輪上然后松開手指。
The welded steel wire must have a long loose section. What we need to do is to run the steel wire sent to the guide wheel. First raise the workbench 2mm to open the slack steel wire with the finger, and reduce the opening arm to open the guide wheel at the speed of 0.1m/s until the looser line is on the guide wheel and then loosens the finger.
用先用粗砂紙將鋼線的兩個頭子的直徑砂少到原有鋼線的1/2—2/3,砂的長度>5cm,在用細(xì)砂紙將鋼線的表面砂光滑,更后用酒精將兩個鋼線頭子洗干凈。
Using the coarse sand paper to reduce the diameter of the two heads of the steel wire to the 1/2 - 2/3 of the original steel wire, the length of the sand is >5cm, and the surface sand of the steel wire is smooth in the fine sand paper. Finally, the two steel wire heads are washed with alcohol.
主要停機(jī)時(shí)間過久產(chǎn)生線痕的,從0—8m每隔一秒按下加速度直到速度升到8m/s左右,然后點(diǎn)開始切割。
It mainly solves the problem that the line is long after downtime. It accelerations from 0 to 8m every second, until the speed rises to 8m/s, then the point starts to cut.
取焊錫絲、焊錫膏、電烙鐵將兩個砂去5cm的鋼線頭子重合在一起并將其焊接,過程中用電烙鐵重鋼線的一頭順勢焊道鋼線的別一頭途中兩鋼線頭子必需完全重合不能讓鋼線翹起,如有則只有重新焊過,再用細(xì)砂紙將焊接的部分砂光滑并用酒精洗凈。
Soldering tin wire, solder paste, and electric soldering iron will reclose and weld two 5cm steel wire heads together. In the course of the process, the two wire heads of the steel wire of one end of the electric iron heavy steel line must be completely rejoined on the other side of the steel wire of the electric iron heavy steel line, for example, the steel wire is only rewelded and the welded part of the sand is smooth and washed with alcohol.
本文由切絲切片機(jī)為您提供,我們的網(wǎng)站是:http://jonathasdeandrade.com我們將以全心全意的熱情為您提供更的服務(wù),歡迎您的訪問!
This article is provided by the cut silk slicing machine for you. Our website is: http://jonathasdeandrade.com we will provide you with more quality service and welcome your visit with wholehearted enthusiasm.